
1. Total Floor Area: 17,798m2
2. Stories & Materials
a) B1F~6F: RC structure (fck =24MPa, fy =400MPa)
3. Location: Gwangju, Republic of Korea
4. Structural System
a) Gravity load resisting system: Intermediate moment resisting frame
b) Lateral load resisting system: Shear wall(75% of base shear) & Intermediate moment resisting frame(25% of base shear)
c) Mat foundation: allowable soil bearing stress, fe ≥ 100~300kPa, Ground water level = G.L.-3.1m
2. Stories & Materials
a) B1F~6F: RC structure (fck =24MPa, fy =400MPa)
3. Location: Gwangju, Republic of Korea
4. Structural System
a) Gravity load resisting system: Intermediate moment resisting frame
b) Lateral load resisting system: Shear wall(75% of base shear) & Intermediate moment resisting frame(25% of base shear)
c) Mat foundation: allowable soil bearing stress, fe ≥ 100~300kPa, Ground water level = G.L.-3.1m
*) Note: Turn-Key Project with Preliminary Design only
댓글 없음:
댓글 쓰기